Projects
LIST OF WORKS COMPLETED |
From 1990-2009 |
A. WORK EXECUTED IN M/s. HINDUSTAN ZINC LTD. CHITTORGARH |
Sl.No. |
Name Of Work |
Amount |
Completion of Period |
Name Of Client |
1 |
Const of 1 No Type D,12 No Type C
Quarters & 230 C.umt Capacity R.C.C
Overhead Tank at C.L.Z.S |
30,00,000 |
16 Months |
M/s. Hindustan Zinc Ltd.
C.L.Z.S Chittorgarh |
2 |
Const of 2 Nos D Type and 16 Nos A
Type quarters at C.L.Z.S |
26,98,000 |
13 Months |
M/s. Hindustan Zinc Ltd.
C.L.Z.S Chittorgarh |
3 |
Const of 16 Nos Type C Quarters at
C.L.Z.S |
30,61,000 |
14 Months |
M/s. Hindustan Zinc Ltd.
C.L.Z.S Chittorgarh |
4 |
Const of 24 Nos Type A Quarters at C.L.Z.S (Reinforcement Steel Used for the above work was issued free of cost by H.Z.L) |
25,96,000 |
8 Months |
M/s. Hindustan Zinc Ltd.
C.L.Z.S Chittorgarh |
B. WORK EXECUTED IN M/s. NARCOTICS DEPARTMENT |
1 |
Const of 6 Nos III Rd Type Quarter for
Judicial officer at Udaipur
245/4216/JUD/P94-95 |
30,00,000 |
12 Months |
Office Of The Executive Engineer
P.W.D Udaipur |
C. WORK EXECUTED IN M/s. NORTH WESTERN RAILWAY |
1 |
Const 24 units Type I, 1 units Type II &
6 Units Type III Quarters at
Shambhupura, in connection with Kota
Chittorgarh B.G. Railway Line
C7S/668 |
34,99,000 |
15-1-1993 |
Executive Engineer ( Const )
Western Railway - Kota. |
2 |
Const OF Officers Rest House & Camp
Office at Udaipur City in Connection with Udaipur - Chittorgarh Gauge Conversion Project Office Dy. Chief Engineer ( C ) Western Railway Udaipur
W.O No CE/CUDZ/CA/5 DT. 23-5-2000 |
8,48,333 |
3 Months |
Dy Chief Engineer ( C ) Western
Railway Udaipur |
D. WORK EXECUTED IN M/s. B.S.N.L DEPARTMENT |
1 |
Const Of 4 Nos Type I ,2 Nos Type II ,2
Nos Type III Postal Staff Quarters &
External Services & Earth Filling at
Mount - Abu |
25,19,728.79 |
14 Months |
Executive Engineer ( Civil )
Postal Division Jaipur. |
2 |
Const of Post office building at
Fatehnagar |
3,27,965 |
9 Months |
Executive Engineer ( Civil )
Postal Division Jaipur. |
3 |
Const of Wooden Counter in G.P.O
Ajmer |
1,39,190 |
25 Days |
Executive Engineer ( Civil )
Postal Division Jaipur. |
4 |
Const Of C.C Tiles on Terrace in G.P.O
at Ajmer |
1,48,946 |
2 Months |
Executive Engineer ( Civil )
Postal Division Jaipur. |
5 |
Const of T.E ( 2 KC -DOT ) Building
including internal & external services
at Kekri W.O No 82/EE/TC/UPR/94-95 |
19,21,272 |
11 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
6 |
Const of T.E. ( 2 KC-DOT) Building
including internal & external services at Pratapgarh ( Chittorgarh ) W.O No
87/EE/TC/UPR/94-95 |
18,22,919 |
9 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
7 |
Const of Vertical Extension of 2 -KC DOT Building at Pratapgarh ( Chittorgarh ) W.O No 19/EE/TC/UPR/96-97 |
19,86,297 |
11 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
8 |
Const Of 6 Nos Type III Telecom Staff
Quarters internal &external Services at
Dungarpur W.O No 58/EE/TC/UPR/01-02
DT. 8-11-2001 |
19,74,194 |
12 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
9 |
Const of 8 Nos Type IV Telecom Staff
Quarters Internal & External Services at
Manwa Khera W.O No 3/EE/TC / UPR / 2000 -2001 DT.29-8-2000 |
33,79,136 |
12 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
10 |
Const Of Administrative Building Internal & External Services at Chittorgarh W.O No 1/EE/TC/UPR / 2002 - 03 DT. 21-5-02 |
92,00,526 |
13 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
11 |
Const of 6 Nos Type II , 2 Nos Type III & 2 Nos Type IV Telecom Staff Quarters
including internal & External Services at Sagwara Dist Dungarpur W.O No 73/EE/TC/UPR/2000-2001 DT.13-4-01 |
32,22,599 |
12 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
12 |
Const Of 2 KC -DOT Building including
internal Services at Sagwara Dist
Dungarpur. W.O No 28 / EE / T C / UPR / 1999 – 2000 DT. 24-3-2000 |
39,84,471 |
15 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
13 |
Const of 4 Bay 2 T.E ( Special )Building
including Internal & External Services at
Galiakot Dist Dungarpur W.O No
Continue 15/EE/TC/UPR/2000-2001 |
18,05,052 |
13 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
14 |
Const of Horizontal and Vertical Extension including internal and External Services at Fatehnagar Dist Udaipur W.O No 13/EE/TC/UPR/2001-2002 |
19,02,658 |
11 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
15 |
Providing Counter For Customer Service
Centre at Admin Building at Sirohi.
W.O No 25/EE/TC/UPR/2002-03 DT.20 - 8 - 02 |
1,77,485 |
1 Month |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
16 |
Providing & Fixing Aluminum Partition and Antiastic Flooring in Various Telecom Building under TCSD Bhilwara W.O No 40/EE/TC/AJ/2001-2002 |
4,76,976 |
12 Months |
Office of The Executive Engineer
Telecom Civil Division Ajmer. |
17 |
Providing Of falseceiling , Aluminum partition n , Wall Painting , PVC Flooring & Antiastic Flooring in Various Building under SSA Sirohi W.O No 41/EE/TC/UPR/2001-2002 |
6,22,802 |
16 Months |
Office Of The Executive Engineer
B.S.N.L Telecom Civil Division
Udaipur. |
18 |
Const of 2 KC Type III Telecom Staff Quarters including internal & External Services at Rati Talai Banswara W.O No 40/EE/TC/UPR 03-04 DT.17-1-2004
as per Work Order 3710361.33/- |
47,31,110 |
15 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
19 |
Const of Damaged Retaining Wall in Telecom Colony at Rati Talai Banswara W.O No 31/EE/TC/UPR/2004-2005 DT. 10-9-04 |
2,92,499 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
20 |
A/R AND M/O For T.E Building Banswara
W.O No 15/EE/TC/UPR.2005-2006 DT. 3-5-2005 |
1,01,741 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur
|
21
|
Addition and Alteration in 3 Nos Inspection Quarters in T.E Building at Mount Abu W.O No 20/EE/TC/UPR/2005-2006 |
1,02,398 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
22 |
Putting Hording on Departmental Building at Kailashpuri GSM, ishabhdeo, Iswal, Dhariyaw, T.E, Vallabh Nagar, T.E Nathdwara , T.E Salumber, Nahar Magra M/W, Bhatewar and Kherwara T.E in SSA Udaipur W.O No 31/EE/TC/UPR/2005-2006 DT. 14-10-2005 |
4,93,869 |
3 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
23 |
Const Of Foundation For 40 M Narrow base Light Weight Tower at Kotra, Chawand & Nahar Magra in Udaipur SSA
W.O No 16/EE/TC/UPR/2006-2007 DT. 26-7-06 |
8,72,600 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
24 |
Const Of Santry Hut and Customer Service Centre at Dalot, Parsoli, Kanera and Gangrar in SSA Chittorgarh W.O No 17/EE/TC/UPR/2006-07 DT. 5-8-06 |
8,14,818 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
25 |
Const of Community Centre at Manwa Khera Udaipur W.O No 18/EE/TC/UPR/2006-2007 DT. 11-8-2006 |
25,85,001 |
10 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
26 |
Const of Compound wall and Santry hut at B.S.N.L Plot Kotra Dist Udaipur
W.O No 46/EE/TC/UPR/2006-2007 |
6,30,758 |
3 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
27 |
Const Of " E" Type Building including Internal and External Services at Gangrar Dist Chittorgarh W.O No 42/EE/TC/UPR/2006-2007 |
22,51,784 |
9 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
28 |
Const of "E" Type Single Storied Building including internal & external services at Rishabhdev |
12,48,000 |
4 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
29 |
Providing and Laying Tar felt Water Proofing Treatment on roof of T.E Building at Chittorgarh Agreement No :11/EE/TC/UPR/2007-08 DT.7-5-07 |
1,77,260 |
1 Month |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
30 |
Providing and laying Cement based water proofing Treatment on the Terrace of Coaxial Building at Chetak Circle Udaipur Agreement No 2/EE/TC/UPR/2007-08 DT. 19-4-07 |
2,02,195 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
31 |
Construction of Vehicle Stand and Pipe Line in the garden of ADM Building at Gandhinagar Chittorgarh. Agreement No: 81/EE/TC/UPR/2007- 08 DT. 23-4-07 |
4,11,421 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
32 |
Providing and Fixing False Flooring for installation of BSE at Banswara Agreement No: 17/EE/TC/UPR /2007-08 DT. 16-6-07 |
1,07,860 |
1 Month |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
33 |
Raising of Compound Wall of Telecom Plot at Gandhinagar Chittorgarh Agreement No :32/EE/TC/UPR/2007-08 DT.6-9-07 |
2,83,686 |
3 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
34 |
Const of "E" Type Single Storied T.E Building and Compound Wall including internal and external services at Akola Dist Chittorgarh |
22,53,968.98 |
9 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
35 |
Const of Partial "E" Type single storied T.E Building including internal and external services at : Railmagra Dist Rajsamand Agreement No :42/EE/TC/UPR/2007-08 DT. 26-10-07 |
16,43,431.37 |
6 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
36 |
Provision for steel structure for Neon sign roof of ADM Building Sec 4 Udaipur Agreement No 44/EE/TC/UPR/2007-08 DT. 27-10-07 |
2,00,000 |
1 Month |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
37 |
Construction Tower Foundation, Security Hut and Boundary Wall for USO F Towers in Specified rural and remote areas in cluster no 63 for 4 Nos stations at soonkhar, Sogari Ki Bhagal, Kishan Puriya Beeran and Rajyawas in Dist
Rajsamand .Vide Agreement No :
67/EE/TC/UPR/2007-08 DT.16-1-08 |
24,05,500 |
4 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
38 |
Construction Tower Foundation, Security Hut and Boundary Wall for USO F Towers in Specific Rural and remote areas in cluster no 63.
for 5 Nos stations at Rawachh, Kada, Sadra, Bokhara and Kheri in dist Udaipur Vide Agreement No
: 75/EE/TC/UPR/2007-08 DT.12-2-08 |
30,23000 |
8 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
39 |
Construction Tower Foundation, Security Hut and Boundary Wall for USO F Towers in Specific Rural and remote areas in cluster no 63. for 4 Nos stations at Itawa, Jharol, Modji Ka Khera and Leerdi Khera in Dist Chittorgarh. Vide Agreement No 80/EE/TC/UPR/2007-2008 |
26,00,000 |
4.5 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
40 |
Renovation of Toilet, Floors With other Misc Civil work in Suite No 3,4&5 in main T.E Building G ,Sec-4 Udaipur Vide Agreement No 20/EE/TC/UPR/2008-09 DT.26-8-08 |
5,39,307 |
5 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
41 |
Rehabilitation of Cracked Balcony Column, Toilet Slabs and other R.C.C member at P&T Colony SEC-4 Udaipur Vide Agreement No: 27/EE/TC/UPR/2008-09 DT.10-11-08 |
2,75,940 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
42 |
Construction of Tower Foundation, Security Hut and Boundary Wall For USO F Towers in specified
Rural and remote areas in cluster no 63. For 6 Nos Stations at Part-I at Stations at Kothar, Kothar, Demat, Ambasa, Subedra, Puriya Kheri and
Chayalon Ka Khera in Dist Udaipur .
35/EE/TC/UPR/2008-09 DT.10-12-08 |
13,50,698 |
3 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
43 |
Project Arrow Post Office A window To Aam Adami SH: Post Office Interior & Civil Work) at Sirohi Vide Agreement No: 36/EE/TC/UPR /2008-09 DT.12-12-08 |
6,11,193 |
2 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
44 |
Project Arrow Post Office A window To Aam Adami SH: Post Office Interior & Civil Work) at Kankroli Dist Rajsamand.
Agreement No :39/EE/TC/UPR/2008-09 DT.24-12-08 |
5,58,004 |
1 Month |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
45 |
Raising of compound wall of BSNL Staff Colony at Rati Talai ,Banswara (Raj) Agreement No 59/EE/TC/UPR/2008-09 DT.28-3-09 |
6,36,348 |
3 Months |
Office of The Executive Engineer
Telecom Civil Division Udaipur |
E. WORK EXECUTED IN M/s. BINANI CEMENT LTD. |
1 |
Const of 24 Nos B Type Quarters at
Binanigarm, Binani Cement Ltd.
W.O No BC/GM/CIVIL/97/227 DT. 12-4-97 Cement Supply Free Of Cost & Steel |
64,00,000 |
10 Months |
Shri Asgar Ali
General Manager Civil
Binani Cement Ltd. Pindwara |
2 |
Const of Foundation Of Weigh Bridge & Approach has at Binani Cement Ltd Pindwara W.O No BCP/Cl/WO/96/75 DT.1-11-96 |
3,09,483 |
45 Days |
V.K Sharma
Chief Manager Civil
Binani Cement Ltd Pindwara |
3 |
Const of Club Building at Binani Cement Ltd Binani Gram Pindwara W.O No BC/Civil/97/1521 DT. 2-8-1997 |
5,63,000 |
4 Months |
Yakub Ali
G.M Civil Binani Cement Ltd
Pindwara. |
4 |
Const Of School Building Binani Cement Ltd. Binani Gram Pindwara W.O No BC/Civil/s.chool-96/1764 Cement Supply Free Of Cost & Steel |
56,12,678 |
8 Months |
Asgar Ali
General Manager Civil
Binani Cement Ltd. Pindwara |
5 |
Const of Club Building at Binani Cement Ltd W.O NO BC/Civil-EW/98/4955 DT. 30-5-1998 |
9,25,533 |
4 Months |
Yakub Ali
G.M Civil Binani Cement Ltd
Pindwara. |
6 |
Land Scraping Work at ADM Building Binani Cement Ltd Pindwara W.O No BCP/CL/WO/98/ C-139 DT. 27-11-1998 |
3,39,712 |
3 Months |
V.K Sharma
Chief Manager Civil
Binani Cement Ltd Pindwara |
F. WORK EXECUTED IN M/s. SECURE METRES DEPARTMENT |
1 |
Civil Renovation work of Secure Meter
|
20,00,000 |
12 Months |
M/s. Secure Meters Ltd.
Pratap Nagar ,Udaipur |
2 |
Const Of Boundary Wall at Pratap Nagar
|
12,00,000 |
5 Months |
M/s. Secure Metre Ltd.
Pratap Nagar ,Udaipur |
3 |
Misc Civil Work at Pratap Nagar
|
4,00,000 |
5 Months |
M/s. Secure Meter Ltd.
Pratap Nagar ,Udaipur |
G. WORK EXECUTED IN M/s. RHSDP DEPARTMENT |
1 |
Addition & Alteration work of CHC Mavli Dist Udaipur |
58,00,000 |
12 Months |
M/s. RHSDP Dep’t Jaipur |
H. WORK EXECUTED IN M/s. Central Office Mewar Organization |
1 |
Addition & Alteration work at Sunset at
City Palace Udaipur Civil work & Structural Work |
12,00,000 |
3 Months |
M/s. Lake Shore Hotels & Motels Pvt. Ltd Udaipur |
2 |
Misc Civil Work at Trust Office.W.O No 115720 |
28875 |
1 Month |
M/s. Maharana mewar Charitable |
3 |
Civil Work at Sunset Terrace. W.O No:116839 DT.31-10-07 |
13,394 |
15 Days |
M/s. Fateh Prakash Palace Hotel
Udaipur |
4 |
A.C Sheet ducting For Covering PVC Pipes at Sun set Terrace .W.O No 115127 DT.18-9-07 |
10,125 |
10 Days |
M/s. Fateh Prakash Palace Hotel
Udaipur |
5 |
Providing and Laying A.C Sheet
W.O No 122526 DT.12-3-08 |
14,850 |
10 Days
|
M/s. Fateh Prakash Palace Hotel
Udaipur |
6 |
Misc Civil Work W.O No 123482 DT.31-3-08 |
1,06,222 |
1 Month |
M/s. Fateh Prakash Palace Hotel
Udaipur |
7 |
Misc Civil Work .W.O No 122534 DT.12-3-08 |
23,600 |
20 Days |
M/s. Shikarbadi Palace Hotel
Udaipur |
8 |
Const of Boundary Wall Misc W.O No 122311 DT.7/3/2008 |
1,95,497 |
1 Month |
M/s. Fateh Prakash Palace Hotel
Udaipur |
9 |
Misc Civil Work .W.O No 12318 DT.31-3-08 |
92,692 |
25 Days |
M/s. Fateh Prakash Palace Hotel
Udaipur |
10 |
Misc Civil Work |
1,37,504 |
25 Days |
M/s. Fateh Prakash Palace Hotel
Udaipur |
11 |
Construction Of Pathway |
28,79,000 |
45 Days |
M/s. Jagmandir Fateh Prakash Palace Hotel Udaipur |
12 |
Construction Of Stage W.O No 127012 |
10,74,254 |
45 Days |
M/s. Jagmandir Fateh Prakash Palace Hotel Udaipur |
13 |
Construction of Store & Pantry W.O No 127103 |
10,28,060 |
50 Days |
M/s. Jagmandir Fateh Prakash Palace Hotel Udaipur |
I. WORK EXECUTED IN M/s. RAJASTHAN STATE MINES & MINERALS LTD. DEPARTMENT |
1 |
Residential Accommodation Of M.D House at Tiger Hill Resort Udaipur W.O NO : RSMM/CO/CPA/CIVIL/276 DT.17-9-2005 |
47,46,000 |
14 MONTHS |
M/s. Rajasthan State Mines &
Minerals Ltd Udaipur |
2 |
Repairing of Road From Base Camp To
Jhameshwarji Temple at Jhamarkotra ,Udaipur W.O No: RSMM/PHOS/Engg.(C) / 13/2005-06/289 DT.8/11/2005 |
10,91,494 |
3 Months |
M/s. Rajasthan State Mines &
Minerals Ltd Udaipur |
J. WORK EXECUTED IN M/s. WOLKEM INDIA LTD. |
1 |
Civil Const and Structural Steel
Fabrication /Erection Work For
Micronising Unit, Finished Goods, D.G
Shed ,MVSB Building P-52 Foundation
Etc Wolkem India Ltd. Sirohi Road
100 MT Structural & Reinforcement Steel Free of Cost Supplied By CO. |
40,00,000 |
8 Months |
Mohammad Hussain
Manager Civil ( Maintenance )
Wolkem India Ltd.
Noble House Swaroop Sagar Road Udaipur |
2 |
Miss Civil Work Laboratory Civil Work W.O No Lab 02/2009 DT. 7-2-09 |
3,12,000 |
2 Month |
M/s. Wolkem India Limited
Polyfilas Division M.I.A
Udaipur |
3 |
Water Proofing and Insulation work for Wolkem Office Building M.I .A Udaipur W.O NO 001 DT.3-4-09 |
13,68,000 |
45 Days |
M/s. Wolkem India Limited
Noble House Swaroop Sagar Road |
K. WORK EXECUTED IN P.I INDISUTRIES LTD ANKALESHWAR & UDAIPUR |
1 |
Tiles Fixing W.O No 4500073908 |
11,60,000 |
5 Months |
M/s.P.I Industries Ltd
237 G.I.D.C Panoli, Ankaleshwar (Guj) |
L. WORK EXECUTED IN HOTEL LEELA VENTURES LTD UDAIPUR |
1 |
Civil Work Vide W.O No HLVL/ UDR/ CKK/BE / WO / 006/2009 DT. 17-3-09 |
99,25,550
Completed |
4 Months |
M/s. Hotel Leela Ventures Ltd
The Leela Kempinski Sahar Mumbai |
2
|
Mirror Polishing work in Swimming Pool and Adjoining Area W.O No : HLVL/UDR/PRO/CWO/ CWO/L-53A/2009 DT.24-4-2009
Construction Of 2 Nos Duplex Residential House at Bedwas, Pratap Nagar, Udaipur |
3,80,000
Completed
70,00,000
(Work in Progress) |
1 Month
8 Months
|
M/s. Hotel Leela Ventures Ltd
The Leela Kempinski ,Sahar Mumbai
Own Project. |
|
|