LIST OF WORKS COMPLETED

From 1990-2009

A. WORK EXECUTED IN M/s. HINDUSTAN ZINC LTD. CHITTORGARH

Sl.No.

Name Of Work

Amount

Completion of Period

Name Of Client

1

Const of 1 No Type D,12 No Type C

Quarters & 230 C.umt Capacity R.C.C

Overhead Tank at C.L.Z.S

30,00,000

16 Months

M/s. Hindustan Zinc Ltd.

C.L.Z.S Chittorgarh

2

Const of 2 Nos D Type and 16 Nos A

Type quarters at C.L.Z.S

26,98,000

13 Months

M/s. Hindustan Zinc Ltd.

C.L.Z.S Chittorgarh

3

Const of 16 Nos Type C Quarters at

C.L.Z.S

30,61,000

14 Months

M/s. Hindustan Zinc Ltd.

C.L.Z.S Chittorgarh

4

Const of 24 Nos Type A Quarters at C.L.Z.S (Reinforcement Steel Used for the above work was issued free of cost by H.Z.L)

25,96,000

8 Months

M/s. Hindustan Zinc Ltd.

C.L.Z.S Chittorgarh

B. WORK EXECUTED IN M/s. NARCOTICS DEPARTMENT

1

Const of 6 Nos III Rd Type Quarter for

Judicial officer at Udaipur

245/4216/JUD/P94-95

30,00,000

12 Months

Office Of The Executive Engineer

P.W.D Udaipur

C. WORK EXECUTED IN M/s. NORTH WESTERN RAILWAY

1

Const 24 units Type I, 1 units Type II &

6 Units Type III Quarters at

Shambhupura, in connection with Kota

Chittorgarh B.G. Railway Line

C7S/668

34,99,000

15-1-1993

Executive Engineer ( Const )

Western Railway - Kota.

2

Const OF Officers Rest House & Camp

Office at Udaipur City in Connection with Udaipur - Chittorgarh Gauge Conversion Project Office Dy. Chief Engineer ( C ) Western Railway Udaipur

W.O No CE/CUDZ/CA/5 DT. 23-5-2000

8,48,333

3 Months

Dy Chief Engineer ( C ) Western

Railway Udaipur


D. WORK EXECUTED IN M/s. B.S.N.L DEPARTMENT

1

Const Of 4 Nos Type I ,2 Nos Type II ,2

Nos Type III Postal Staff Quarters &

External Services & Earth Filling at

Mount - Abu

25,19,728.79

14 Months

Executive Engineer ( Civil )

Postal Division Jaipur.

2

Const of Post office building at

Fatehnagar

3,27,965

9 Months

Executive Engineer ( Civil )

Postal Division Jaipur.

3

Const of Wooden Counter in G.P.O

Ajmer

1,39,190

25 Days

Executive Engineer ( Civil )

Postal Division Jaipur.

4

Const Of C.C Tiles on Terrace in G.P.O

at Ajmer

1,48,946

2 Months

Executive Engineer ( Civil )

Postal Division Jaipur.

5

Const of T.E ( 2 KC -DOT ) Building

including internal & external services

at Kekri W.O No 82/EE/TC/UPR/94-95

19,21,272

11 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

6

Const of T.E. ( 2 KC-DOT) Building

including internal & external services at Pratapgarh ( Chittorgarh ) W.O No

87/EE/TC/UPR/94-95

18,22,919

9 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

7

Const of Vertical Extension of 2 -KC DOT Building at Pratapgarh ( Chittorgarh ) W.O No 19/EE/TC/UPR/96-97

19,86,297

11 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

8

Const Of 6 Nos Type III Telecom Staff

Quarters internal &external Services at

Dungarpur W.O No 58/EE/TC/UPR/01-02

DT. 8-11-2001

19,74,194

12 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

9

Const of 8 Nos Type IV Telecom Staff

Quarters Internal & External Services at

Manwa Khera W.O No 3/EE/TC / UPR / 2000 -2001 DT.29-8-2000

33,79,136

12 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

10

Const Of Administrative Building Internal & External Services at Chittorgarh W.O No 1/EE/TC/UPR / 2002 - 03 DT. 21-5-02

92,00,526

13 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

11

Const of 6 Nos Type II , 2 Nos Type III & 2 Nos Type IV Telecom Staff Quarters

including internal & External Services at Sagwara Dist Dungarpur W.O No 73/EE/TC/UPR/2000-2001 DT.13-4-01

32,22,599

12 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

12

Const Of 2 KC -DOT Building including

internal Services at Sagwara Dist

Dungarpur. W.O No 28 / EE / T C / UPR / 1999 – 2000 DT. 24-3-2000

39,84,471

15 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

13

Const of 4 Bay 2 T.E ( Special )Building

including Internal & External Services at

Galiakot Dist Dungarpur W.O No

Continue 15/EE/TC/UPR/2000-2001

18,05,052

13 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

14

Const of Horizontal and Vertical Extension including internal and External Services at Fatehnagar Dist Udaipur W.O No 13/EE/TC/UPR/2001-2002

19,02,658

11 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

15

Providing Counter For Customer Service

Centre at Admin Building at Sirohi.

W.O No 25/EE/TC/UPR/2002-03 DT.20 - 8 - 02

1,77,485

1 Month

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

16

Providing & Fixing Aluminum Partition and Antiastic Flooring in Various Telecom Building under TCSD Bhilwara W.O No 40/EE/TC/AJ/2001-2002

4,76,976

12 Months

Office of The Executive Engineer

Telecom Civil Division Ajmer.

17

Providing Of falseceiling , Aluminum partition n , Wall Painting , PVC Flooring & Antiastic Flooring in Various Building under SSA Sirohi W.O No 41/EE/TC/UPR/2001-2002

6,22,802

16 Months

Office Of The Executive Engineer

B.S.N.L Telecom Civil Division

Udaipur.

18

Const of 2 KC Type III Telecom Staff Quarters including internal & External Services at Rati Talai Banswara W.O No 40/EE/TC/UPR 03-04 DT.17-1-2004

as per Work Order 3710361.33/-

47,31,110

15 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

19

Const of Damaged Retaining Wall in Telecom Colony at Rati Talai Banswara W.O No 31/EE/TC/UPR/2004-2005 DT. 10-9-04

2,92,499

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

20

A/R AND M/O For T.E Building Banswara

W.O No 15/EE/TC/UPR.2005-2006 DT. 3-5-2005

1,01,741

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

 

21



Addition and Alteration in 3 Nos Inspection Quarters in T.E Building at Mount Abu W.O No 20/EE/TC/UPR/2005-2006

1,02,398

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

22

Putting Hording on Departmental Building at Kailashpuri GSM, ishabhdeo, Iswal, Dhariyaw, T.E, Vallabh Nagar, T.E Nathdwara , T.E Salumber, Nahar Magra M/W, Bhatewar and Kherwara T.E in SSA Udaipur W.O No 31/EE/TC/UPR/2005-2006 DT. 14-10-2005

4,93,869

3 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

23

Const Of Foundation For 40 M Narrow base Light Weight Tower at Kotra, Chawand & Nahar Magra in Udaipur SSA

W.O No 16/EE/TC/UPR/2006-2007 DT. 26-7-06

8,72,600

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

24

Const Of Santry Hut and Customer Service Centre at Dalot, Parsoli, Kanera and Gangrar in SSA Chittorgarh W.O No 17/EE/TC/UPR/2006-07 DT. 5-8-06

8,14,818

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

25

Const of Community Centre at Manwa Khera Udaipur W.O No 18/EE/TC/UPR/2006-2007 DT. 11-8-2006

25,85,001

10 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

26

Const of Compound wall and Santry hut at B.S.N.L Plot Kotra Dist Udaipur

W.O No 46/EE/TC/UPR/2006-2007

6,30,758

3 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

27

Const Of " E" Type Building including Internal and External Services at Gangrar Dist Chittorgarh W.O No 42/EE/TC/UPR/2006-2007

22,51,784

9 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

28

Const of "E" Type Single Storied Building including internal & external services at Rishabhdev

12,48,000

4 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

29

Providing and Laying Tar felt Water Proofing Treatment on roof of T.E Building at Chittorgarh Agreement No :11/EE/TC/UPR/2007-08 DT.7-5-07

1,77,260

1 Month

Office of The Executive Engineer

Telecom Civil Division Udaipur

30

Providing and laying Cement based water proofing Treatment on the Terrace of Coaxial Building at Chetak Circle Udaipur Agreement No 2/EE/TC/UPR/2007-08 DT. 19-4-07

2,02,195

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

31

Construction of Vehicle Stand and Pipe Line in the garden of ADM Building at Gandhinagar Chittorgarh. Agreement No: 81/EE/TC/UPR/2007- 08 DT. 23-4-07

4,11,421

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

32

Providing and Fixing False Flooring for installation of BSE at Banswara Agreement No: 17/EE/TC/UPR /2007-08 DT. 16-6-07

1,07,860

1 Month

Office of The Executive Engineer

Telecom Civil Division Udaipur

33

Raising of Compound Wall of Telecom Plot at Gandhinagar Chittorgarh Agreement No :32/EE/TC/UPR/2007-08 DT.6-9-07

2,83,686

3 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

34

Const of "E" Type Single Storied T.E Building and Compound Wall including internal and external services at Akola Dist Chittorgarh

22,53,968.98

9 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

35

Const of Partial "E" Type single storied T.E Building including internal and external services at : Railmagra Dist Rajsamand Agreement No :42/EE/TC/UPR/2007-08 DT. 26-10-07

16,43,431.37

6 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

36

Provision for steel structure for Neon sign roof of ADM Building Sec 4 Udaipur Agreement No 44/EE/TC/UPR/2007-08 DT. 27-10-07

2,00,000

1 Month

Office of The Executive Engineer

Telecom Civil Division Udaipur

37

Construction Tower Foundation, Security Hut and Boundary Wall for USO F Towers in Specified rural and remote areas in cluster no 63 for 4 Nos stations at soonkhar, Sogari Ki Bhagal, Kishan Puriya Beeran and Rajyawas in Dist

Rajsamand .Vide Agreement No :

67/EE/TC/UPR/2007-08 DT.16-1-08

24,05,500

4 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

38

Construction Tower Foundation, Security Hut and Boundary Wall for USO F Towers in Specific Rural and remote areas in cluster no 63.

for 5 Nos stations at Rawachh, Kada, Sadra, Bokhara and Kheri in dist Udaipur Vide Agreement No

: 75/EE/TC/UPR/2007-08 DT.12-2-08

30,23000

8 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

39

Construction Tower Foundation, Security Hut and Boundary Wall for USO F Towers in Specific Rural and remote areas in cluster no 63. for 4 Nos stations at Itawa, Jharol, Modji Ka Khera and Leerdi Khera in Dist Chittorgarh. Vide Agreement No 80/EE/TC/UPR/2007-2008

26,00,000

4.5 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

40

Renovation of Toilet, Floors With other Misc Civil work in Suite No 3,4&5 in main T.E Building G ,Sec-4 Udaipur Vide Agreement No 20/EE/TC/UPR/2008-09 DT.26-8-08

5,39,307

5 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

41

Rehabilitation of Cracked Balcony Column, Toilet Slabs and other R.C.C member at P&T Colony SEC-4 Udaipur Vide Agreement No: 27/EE/TC/UPR/2008-09 DT.10-11-08

2,75,940

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

42

Construction of Tower Foundation, Security Hut and Boundary Wall For USO F Towers in specified

Rural and remote areas in cluster no 63. For 6 Nos Stations at Part-I at Stations at Kothar, Kothar, Demat, Ambasa, Subedra, Puriya Kheri and

Chayalon Ka Khera in Dist Udaipur .

35/EE/TC/UPR/2008-09 DT.10-12-08

13,50,698

3 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

43

Project Arrow Post Office A window To Aam Adami SH: Post Office Interior & Civil Work) at Sirohi Vide Agreement No: 36/EE/TC/UPR /2008-09 DT.12-12-08

6,11,193

2 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

44

Project Arrow Post Office A window To Aam Adami SH: Post Office Interior & Civil Work) at Kankroli Dist Rajsamand.

Agreement No :39/EE/TC/UPR/2008-09 DT.24-12-08

5,58,004

1 Month

Office of The Executive Engineer

Telecom Civil Division Udaipur

45

Raising of compound wall of BSNL Staff Colony at Rati Talai ,Banswara (Raj) Agreement No 59/EE/TC/UPR/2008-09 DT.28-3-09

6,36,348

3 Months

Office of The Executive Engineer

Telecom Civil Division Udaipur

E. WORK EXECUTED IN M/s. BINANI CEMENT LTD.

1

Const of 24 Nos B Type Quarters at

Binanigarm, Binani Cement Ltd.

W.O No BC/GM/CIVIL/97/227 DT. 12-4-97 Cement Supply Free Of Cost & Steel

64,00,000

10 Months

Shri Asgar Ali

General Manager Civil

Binani Cement Ltd. Pindwara

2

Const of Foundation Of Weigh Bridge & Approach has at Binani Cement Ltd Pindwara W.O No BCP/Cl/WO/96/75 DT.1-11-96

3,09,483

45 Days

V.K Sharma

Chief Manager Civil

Binani Cement Ltd Pindwara

3

Const of Club Building at Binani Cement Ltd Binani Gram Pindwara W.O No BC/Civil/97/1521 DT. 2-8-1997

5,63,000

4 Months

Yakub Ali

G.M Civil Binani Cement Ltd

Pindwara.

4

Const Of School Building Binani Cement Ltd. Binani Gram Pindwara W.O No BC/Civil/s.chool-96/1764 Cement Supply Free Of Cost & Steel

56,12,678

8 Months

Asgar Ali

General Manager Civil

Binani Cement Ltd. Pindwara

5

Const of Club Building at Binani Cement Ltd W.O NO BC/Civil-EW/98/4955 DT. 30-5-1998

9,25,533

4 Months

Yakub Ali

G.M Civil Binani Cement Ltd

Pindwara.

6

Land Scraping Work at ADM Building Binani Cement Ltd Pindwara W.O No BCP/CL/WO/98/ C-139 DT. 27-11-1998

3,39,712

3 Months

V.K Sharma

Chief Manager Civil

Binani Cement Ltd Pindwara

F. WORK EXECUTED IN M/s. SECURE METRES DEPARTMENT

1

Civil Renovation work of Secure Meter

 

20,00,000

12 Months

M/s. Secure Meters Ltd.

Pratap Nagar ,Udaipur

2

Const Of Boundary Wall at Pratap Nagar

 

12,00,000

5 Months

M/s. Secure Metre Ltd.

Pratap Nagar ,Udaipur

3

Misc Civil Work at Pratap Nagar

 

4,00,000

5 Months

M/s. Secure Meter Ltd.

Pratap Nagar ,Udaipur

 

G. WORK EXECUTED IN M/s. RHSDP DEPARTMENT

1

Addition & Alteration work of CHC Mavli Dist Udaipur

58,00,000

12 Months

M/s. RHSDP Dep’t Jaipur

H. WORK EXECUTED IN M/s. Central Office Mewar Organization

1

Addition & Alteration work at Sunset at

City Palace Udaipur Civil work & Structural Work

12,00,000

3 Months

M/s. Lake Shore Hotels & Motels Pvt. Ltd Udaipur

2

Misc Civil Work at Trust Office.W.O No 115720

28875

1 Month

M/s. Maharana mewar Charitable

3

Civil Work at Sunset Terrace. W.O No:116839 DT.31-10-07

13,394

15 Days

M/s. Fateh Prakash Palace Hotel

Udaipur

4

A.C Sheet ducting For Covering PVC Pipes at Sun set Terrace .W.O No 115127 DT.18-9-07

10,125

10 Days

M/s. Fateh Prakash Palace Hotel

Udaipur

5

Providing and Laying A.C Sheet

W.O No 122526 DT.12-3-08

14,850

10 Days


M/s. Fateh Prakash Palace Hotel

Udaipur

6

Misc Civil Work W.O No 123482 DT.31-3-08

1,06,222

1 Month

M/s. Fateh Prakash Palace Hotel

Udaipur

7

Misc Civil Work .W.O No 122534 DT.12-3-08

23,600

20 Days

M/s. Shikarbadi Palace Hotel

Udaipur

8

Const of Boundary Wall Misc W.O No 122311 DT.7/3/2008

1,95,497

1 Month

M/s. Fateh Prakash Palace Hotel

Udaipur

9

Misc Civil Work .W.O No 12318 DT.31-3-08 

92,692

25 Days

M/s. Fateh Prakash Palace Hotel

Udaipur

10

Misc Civil Work

1,37,504

25 Days

M/s. Fateh Prakash Palace Hotel

Udaipur

11

Construction Of Pathway

28,79,000

45 Days

M/s. Jagmandir Fateh Prakash Palace Hotel Udaipur

12

Construction Of Stage W.O No 127012

10,74,254

45 Days

M/s. Jagmandir Fateh Prakash Palace Hotel Udaipur

13

Construction of Store & Pantry W.O No 127103

10,28,060

50 Days

M/s. Jagmandir Fateh Prakash Palace Hotel Udaipur

I. WORK EXECUTED IN M/s. RAJASTHAN STATE MINES & MINERALS LTD. DEPARTMENT

1

Residential Accommodation Of M.D House at Tiger Hill Resort Udaipur W.O NO : RSMM/CO/CPA/CIVIL/276 DT.17-9-2005

47,46,000

14 MONTHS

M/s. Rajasthan State Mines &

Minerals Ltd Udaipur

2

Repairing of Road From Base Camp To

Jhameshwarji Temple at Jhamarkotra ,Udaipur W.O No: RSMM/PHOS/Engg.(C) / 13/2005-06/289 DT.8/11/2005

10,91,494

3 Months

M/s. Rajasthan State Mines &

Minerals Ltd Udaipur


J. WORK EXECUTED IN M/s. WOLKEM INDIA LTD.

1

Civil Const and Structural Steel

Fabrication /Erection Work For

Micronising Unit, Finished Goods, D.G

 

Shed ,MVSB Building P-52 Foundation

Etc Wolkem India Ltd. Sirohi Road

100 MT Structural & Reinforcement Steel Free of Cost Supplied By CO.

40,00,000

8 Months

Mohammad Hussain

Manager Civil ( Maintenance )

Wolkem India Ltd.

 

Noble House Swaroop Sagar Road Udaipur

2

Miss Civil Work Laboratory Civil Work W.O No Lab 02/2009 DT. 7-2-09

3,12,000

2 Month

M/s. Wolkem India Limited

Polyfilas Division M.I.A

Udaipur

3

Water Proofing and Insulation work for Wolkem Office Building M.I .A Udaipur W.O NO 001 DT.3-4-09

13,68,000

45 Days

M/s. Wolkem India Limited

Noble House Swaroop Sagar Road

K. WORK EXECUTED IN P.I INDISUTRIES LTD ANKALESHWAR & UDAIPUR

1

Tiles Fixing W.O No 4500073908

11,60,000

5 Months

M/s.P.I Industries Ltd

237 G.I.D.C Panoli, Ankaleshwar (Guj)

L. WORK EXECUTED IN HOTEL LEELA VENTURES LTD UDAIPUR

1

Civil Work Vide W.O No HLVL/ UDR/ CKK/BE / WO / 006/2009 DT. 17-3-09

99,25,550

Completed

4 Months

M/s. Hotel Leela Ventures Ltd

The Leela Kempinski Sahar Mumbai

2





Mirror Polishing work in Swimming Pool and Adjoining Area W.O No : HLVL/UDR/PRO/CWO/ CWO/L-53A/2009 DT.24-4-2009


Construction Of 2 Nos Duplex Residential House at Bedwas, Pratap Nagar, Udaipur

3,80,000

Completed


70,00,000

(Work in Progress)

1 Month




8 Months


M/s. Hotel Leela Ventures Ltd

The Leela Kempinski ,Sahar Mumbai


 Own Project.